Saturday, January 14, 2012

Update On Deconstruction


First of all, the above two pictures of the steeple coming down were lifted from the Kanab Third Ward blog.  Kim W. is our ward historian and was fortunate enough to be in the right place(s) at the right time.  It looks like a cohort took the picture from in front of Duke's.

Last week it looked like this.  Still some piles of rubble here and there.

Remnants of the furnace room and the scout room under the stage.


Here's a bit of historical trivia:  You can see the outline of the original baptismal font located on the lower floor of the original building.  This is in the northwest corner in the room that had the outside entrance.

Notice the bricked up windows.  The opening is the hall at the top of the foyer stairs leading to the primary room (which previously was  the Junior Sunday School room).

Excavation for the new building.


Locals are responsible for gutting the interior of the old building.

Can anyone remember the grating on the north side of the old building in the patio area?  There's still a little coal left at the bottom after all these years!

The front will be restored with the original type stairs and a front entrance.



Notice the original rock behind the radiator.

Exposing the original curved ceiling edges.  These are from the days when the primary room was part of the chapel.